Calendar periods are cumulative through the latest reading.
Estimated TNB Cost
—
Energy + Capacity − ATAP
Estimated Saving
—
Vs load without solar
Solar Generated
—
Total PV Yield
Bought From Grid
—
Includes battery charge
House Used
—
Total site load
Peak Avoided
—
Configured peak protected
Solar Exported
—
Estimated ATAP Credit
—
Estimated from eligible exports and the applicable TNB energy rate. Credit is confined to the same billing cycle.
TNB low-tier cap guard
Loading…
Loading configured tariff
Intraday 24h Power Curve
5-Minute Inverter Power Vectors · Configured peak window shaded red
House Load
Solar PV
Grid Import
Battery SOC
Today’s Battery Optimization Plan
Waiting for a morning shadow run
Recommended Grid Charge—
Latest Battery SOC—
Latest Reading Received—
Grid Charge in Period—
Waiting for the controller’s next decision.
Architectural Power Flow Visualizer
Real-time telemetry vectors mapped to household site node
Solar Forecast (Open-Meteo)
Remaining weather-adjusted generation for the plan date
Predicted Solar PV Yield—
Peak Generation Hours11:30–15:00
Load Forecasting EngineLoading forecast evidence…
Off-peak Grid Top-up Target—
Tomorrow’s DateLoading…
Tomorrow’s Solar / LoadLoading…
Tomorrow’s Grid Top-upDecided at the morning run
Sungai PetaniUpdating…
airwaveCurrent IPU (AQI)
—Loading
water_dropPM2.5 (µg/m³)
—removeLoading
Open-Meteo estimateLoading the nearest official JAS / DOE station…
waves
Current haze—
cloud
Tomorrow trend—
Other environmental data
visibilityVisibility—remove—
sunnyUV index—removeDaily max
speedAir pressure—removeForecast
● Live
Today
Today’s totals · forecast comparison uses the matching issued window
solar_power
PV generated (so far)—
Waiting for issued forecast
—sunny
Remaining forecast PV today—
home
Total load (so far)—
—Waiting for issued forecast
battery_5_bar
Battery SOC now / plan—
—electric_meter
Grid import (so far)—
MeasuredTomorrow
Forecast and adaptive control plan
solar_power
Predicted PV total—
Peak solar
—
—
Estimated load—
Net demand—
Planned grid import—
Target 14:00 SOC—
Tomorrow’s grid decision is made using live SOC during the morning run.
Open-Meteo + local historyLive corrected
Key factors affecting forecast
wavesHaze signal loading
cloudCloud cover loading
humidity_percentageHumidity loading
rainyRain outlook loading
Expected finish SOC—
Forecast reliability—Collecting evidence
Forecast issue time loading…
Actual solarForecastNow
Official IPU is a current JAS / DOE observation. The future air-quality lane is an Open-Meteo PM2.5 outlook and is not an official IPU forecast.
| Metric | Current | Forecast | Δ |
|---|---|---|---|
| Loading weather… | |||
rainy
Today——
Loading…
Loading…
Hover each hourly weather marker for “% cloud · % humidity”.
30-Day Stored Telemetry History
Daily logged PV generation, house load, grid import, and peak avoidance percentage
Power Balance Error (MAE)
0.004 kW
Inverter reading precision
Stored Samples
62,586
Calendar Days: 221
| Date | Solar PV (kWh) | House Load (kWh) | Grid Import (kWh) | Peak Avoidance % |
|---|---|---|---|---|
| Loading stored history… | ||||
FoxESS Inverter Automation
Guarded automation contract — dashboard remains display-only
Automation Control ModeLoading…
Inverter IdentityLoading…
Forecast Grid Charge WindowLoading…
Peak Surcharge WindowLoading…
Battery Floor ReserveLoading…
Overnight Battery HoldLoading…
Safety Backup File PathLoading…
Installed Solar & Storage
Specifications plus the latest read-only FoxESS hardware response
Solar ArrayLoading…
Approx. Panel RatingLoading…
Battery InverterLoading…
PV ArchitectureLoading…
MicroinvertersLoading…
GatewayLoading…
Battery StackLoading…
Slave Module RatingLoading…
Rated StorageLoading…
Current Capacity / HealthLoading…
Supported Battery ScaleLoading…
Configured Usable WindowLoading…
Maximum Grid ChargeLoading…
Hardware Data SourceLoading…
Warranty & lifecycle record
Useful for ownership planning and ROI context; verify start dates against the installer documents before relying on an expiry date.
Loading warranty terms…
Monthly Bill Savings Reconciliation
Loading billing cycles…
| Billing period | TNB estimate | Actual bill | Difference | Without solar | Bill saving | Net benefit |
|---|
Checking bill inputs…
Best Ways to Lower the Bill
Calculating priority actions…